Real-world case studies
EMS and BESS in real operation
See how Brainergy helps companies and organizations cut regulated charges, maximize the use of on-site energy sources and run energy in real time.

What we solve in practice
Three types of benefits you will find in our case studies
Every project follows a clear goal — lower costs, higher self-sufficiency and full real-time control of your energy.
Lower regulated charges
Lower reserved capacity and maximum measured demand. Ready for new tariff structures.
Maximum use of on-site sources
Higher self-consumption from PV, micro-hydro and cogeneration. Efficient operation and energy sharing.
Targeted energy-flow control
Real-time EMS control, BESS, day-ahead (SPOT) optimization, profit optimizer.
Overview of case studies
Real operations, measurable results
Three case studies from different segments — a sports complex, a mountain hotel and an industrial site.
Sportpark HIT Hradec Králové

Installation partner
Brainergy s.r.o.

Starting situation
A sports complex with a restaurant, inflatable halls (winter season) that need continuous electricity supply, on-site PV and upcoming EV chargers.
- High peak demand and reserved capacity
- Rising distribution charges
- Need for backup power against grid outages
- Maximize self-consumption of stored energy in the evening hours
Brainergy solution
- Brainergy EMS
- BESS 250 / 522
- PV control
- EV-charging control
- Maximum-demand reduction
- Off-grid backup
- Real-time monitoring
- Surplus electricity sharing
Results
What the client gained
- Lower regulated charges
- More stable operation
- Outage protection for the inflatable halls
- Protection against demand peaks
- Ready for the new distribution tariffs
- Load manager for EV chargers reducing maximum demand
Luční bouda — mountain hotel

Installation partner
T - Solutions, s.r.o.

Starting situation
A mountain hotel with extreme energy demands and a limited distribution network. The goal was higher self-sufficiency and stable year-round operation.
Brainergy solution
- Brainergy EMS
- PV 48
- Load manager
- BESS 249
- Heating control
- Storage control
- Energy sharing IN / OUT
- Off-grid operation
Results
What the client gained
- Higher energy self-sufficiency
- Backup against grid outages
- More efficient use of on-site sources
- Higher operational safety
- Less dependence on the grid
- Use of shared electricity
- Load manager for 50+ energy-intensive appliances
MEDTEC-VOP

Installation partner
SOLAR SAVE s.r.o.

Starting situation
A manufacturing plant with multiple energy sources and high energy costs. The goal was to optimize electricity purchasing, use on-site generation and lower regulated costs.
Brainergy solution
- Brainergy EMS
- BESS 750 / 1.56
- Reserved-capacity control
- Maximum-demand control
- Power-limit control
- Profit optimizer
- 1× PV — green bonus
- 1× standard PV
Results
What the client gained
- Lower spend on regulated charges
- Maximum use of on-site generation
- Higher operational flexibility
- Optimized electricity purchasing (day-ahead / SPOT)
- Ready for flexibility aggregation
Analysis and design of effective BESS
4 reasons companies choose Brainergy
Analysis and design of effective BESS
We don't sell batteries from a catalog. We design BESS based on the real consumption, generation and economics of each site.
Complete energy ecosystem
EMS, PV, BESS, EV charging and flexibility in one system controlled in real time according to the needs of the operation.
Measurable economics
Designs backed by real data, simulations and a payback calculation for the specific operation and expected savings.
Reliability and long-term support
Continuous dispatch, maintenance and system development across the whole project lifetime. We are a partner, not just a supplier.
Want to find out how your energy infrastructure could work smarter?
Book an introductory consultation. We will review your operation, your goals, and optimization options, and propose the next steps.